The C-NLOPB has received a report from Husky Energy of a small flash fire in the vicinity of the drill floor of the Henry Goodrich that occurred at approximately 11:15 am this morning.

The fire was immediately extinguished using a pressure washer that was readily available on the drill floor. No personnel were injured. Operations have been shut down until circumstances of the event are understood and it is deemed safe to continue drilling operations.

The C-NLOPB is in contact with senior officials at Husky Energy and is monitoring the situation.

Updates will be provided as warranted.

Media Contact:

C-NLOPB Contact
Sean Kelly
Manager of Public Relations
(709) 778-1418
(709) 689-0713 (cell)
skelly@cnlopb.nl.ca

Husky Energy
Colleen McConnell
Husky Energy Communications
(709) 724-3504


Incident Disclosures 2012

DateUpdate
Oct 16, 2012Scheduled Flight Turnaround
Oct 9, 2012Scheduled Flight Turnaround
Oct 9, 2012Scheduled Flight Turnaround
Oct 4, 2012Scheduled Flight Turnaround
Sep 10, 2012Scheduled Flight Turnaround
Sep 4, 2012Dropped Object – Hibernia
Aug 31, 2012Operations Suspended on Henry Goodrich following Near Miss Incident – Update
Aug 29, 2012Scheduled Flight Turnaround
Aug 27, 2012Operations Suspended on Henry Goodrich following Near Miss Incident
Aug 14, 2012Scheduled Flight Turnaround
Aug 13, 2012False Fire Indication in Helicopter Engine
Aug 9, 2012Scheduled Flight Turnaround
Aug 8, 2012Fire in Firewater Pump Room of SeaRose FPSO
Jul 16, 2012Small Flash Fire on Drill Floor of Henry Goodrich – Update
Jul 11, 2012Small Flash Fire on Drill Floor of Henry Goodrich
May 30, 2012Helicopter on the Deck of Terra Nova FPSO – Update
May 30, 2012Helicopter on the Deck of Terra Nova FPSO – Update
May 29, 2012Helicopter on the Deck of Terra Nova FPSO
May 3, 2012Small Fire in Power Generator C on SeaRose FPSO
Mar 21, 2012Helicopter Input Module Chip Light Illumination
Mar 21, 2012Helicopter Input Module Chip Light Illumination – Update
Jan 11, 2012Scheduled Flight Turnaround