Incident Disclosure 2013

Major Impairment/Damage

June 3, 2013

HMDC informed the C-NLOPB that on May 31, 2013, two smoke detectors in an Electric Room went into alarm, causing a General Platform Alarm and Emergency Shutdown of the platform. All personnel mustered safely. An investigation into the cause is currently underway.

Media Contact:

Sean Kelly M.A., APR, FCPRS
Manager of Public Relations
(709) 778-1418
(709) 689-0713 (cell)
skelly@cnlopb.nl.ca


Incident Disclosures 2013

DateUpdate
Nov 15, 2013Hydraulic Pressure Transmitter
Nov 8, 2013Helicopter Indicator Light on one of two Main Gear Box Pumps
Sep 28, 2013Scheduled Flight Turnaround
Sep 25, 2013Possible Stability Augmentation System Problem
Jun 21, 2013Fire on Supply Vessel Atlantic Raven
Jun 3, 2013Major Impairment/Damage
May 14, 2013Engine Chip Light Indication
Apr 22, 2013Non-occupational Medevac
Apr 11, 2013Scheduled Flight Turnaround
Apr 8, 2013Near Miss Incident
Apr 8, 2013Small Fire in Generator Turbine
Apr 2, 2013Near Miss Incident
Apr 2, 2013Scheduled Flight Turnaround
Mar 25, 2013Scheduled Flight Turnaround
Mar 25, 2013Scheduled Flight Turnaround
Mar 15, 2013Scheduled Flight Turnaround
Mar 15, 2013Scheduled Flight Turnaround
Mar 5, 2013Injured Worker Medevac
Jan 28, 2013Scheduled Flight Turnaround