Incident Disclosure 2019

Flushing – South White Rose Extension Drill Centre

May 24, 2019

Since successfully plugging the flowline and recovering the failed flowline connector at the South White Rose Extension Drill Centre (SWRX) on March 19, Husky has developed a plan to flush the SWRX flowline. The C-NLOPB has accepted Husky’s plan.

Husky has been monitoring forecasted conditions offshore for an appropriate weather window and has since determined there is a possible window for implementation beginning tomorrow, May 25, 2019.

Aerial surveillance will be on standby, however conditions are required to be suitable for aerial surveillance while operations proceed. There will be Remotely Operated Vehicle (ROV) coverage with Tier 1 spill response equipment available in the field.

Further discussion between the C-NLOPB and Husky will be required prior to resuming production from the SWRX, North Amethyst Drill Centre and the Southern Drill Centre.

Media Contact:

Husky Energy
Colleen McConnell
Husky Energy Communications
(709) 724-3504
Colleen.McConnell@huskyenergy.com

C-NLOPB
Lesley Rideout
Communications Lead
(709) 725-2900
lrideout@cnlopb.ca


Incident Disclosures 2019

DateUpdate
Dec 30, 2019Injured Worker on Terra Nova FPSO
Nov 25, 2019Helicopter Return to Base
Oct 15, 2019Near Miss on Terra Nova FPSO
Oct 3, 2019C-NLOPB approves resumption of drilling operations on Transocean Barents
Sep 26, 2019Approval of plans to resume operations at Hibernia and update on follow up to recent offshore incidents
Sep 9, 2019Injured Worker on Transocean Barents
Aug 21, 2019C-NLOPB Update on August 17, 2019 Discharge at the Hibernia Platform
Aug 18, 2019August 17, 2019 Discharge at the Hibernia Platform
Aug 16, 2019C-NLOPB approves re-start of production operations from final two drill centres at White Rose field
Aug 15, 2019C-NLOPB approves resumption of production operations at Hibernia Platform
Aug 1, 2019Update – Hibernia Oil Spill
Jul 18, 2019Hibernia Oil Spill
Jul 9, 2019Incident Bulletin – Near Miss with Potential for Fatality on Terra Nova FPSO
Jul 5, 2019Update – Follow-up to November 2018 Oil Spill at White Rose Field
Jun 4, 2019Near Miss on Hibernia Platform
May 24, 2019Flushing – South White Rose Extension Drill Centre
Mar 19, 2019Update on Plugging of Flowline and Recovery of Flowline Connector at the South White Rose Extension Drill Centre
Mar 14, 2019Near Miss Onboard Terra Nova FPSO
Mar 13, 2019Update on Plugging of Flowline and Recovery of Flowline Connector at the South White Rose Extension Drill Centre
Jan 30, 2019C-NLOPB Issues Approvals to Husky Energy
Jan 18, 2019Update – Status of Spill at White Rose Field
Jan 11, 2019Update – Status of Spill at White Rose Field
Jan 7, 2019Update – Status of Spill at White Rose Field